Factory Intelligence.
Factory scheduling is the most operationally consequential decision the enterprise makes daily. When sequencing decisions are made plant-by-plant in isolation, the network optimum is lost.
Finite-Capacity Production Scheduling
MRP releases work the plant can't actually run. The schedule that comes out of planning is feasible on paper and infeasible on the floor. Schedulers spend their days reconciling between planning and execution.
Read card →Sequencing and Changeover Optimization
Production schedules treat every operation as though it cost the same to start regardless of what ran before. In reality, every changeover carries setup time, scrap, and energy cost — and that cost depends on what the li…
Read card →OEE-Aware Capacity Planning
Capacity planning treats nameplate throughput as the available capacity. Reality runs at Overall Equipment Effectiveness (OEE) of 60–85% on a typical line — availability eaten by unplanned downtime, performance by speed…
Read card →Concurrent multi-site finite-capacity production scheduling. Network-optimal sequencing. OEE-aware capacity planning that surfaces to the planning solve.