Lookahead simulation
Every Day-1 decision stress-tested across the futures it has to survive — before commit.
Naive lookahead at depth H across N iterations grows combinatorially impossible. If at each of H days the system branches into N futures, you're looking at N^H trajectories — a million-fold blowup at H=10, N=10. The N^H trap is what kills most attempts at decision-level stress testing.
VYAN's approach is N×H, not N^H. Each of N iterations runs as a single trajectory advancing through H days, with each iteration making its own decisions against its own sampled uncertainty path. A trajectory at day 5 doesn't branch into N new trajectories; it continues, samples its day-6 variability, makes its day-6 decisions, advances. Linear cost, not combinatorial. Tractable on commodity compute.
As each trajectory advances, it records which Day-1 decisions held versus which broke. The result: every Day-1 decision carries a resilience score computed from Day-1 consensus (how many iterations agreed on it at commit time) times future stability (how many of those still hold through H). A decision that 91% of iterations agreed on at commit but only 38% still hold at Day 12 carries a 91% consensus, 38% Day-12 stability — and a named break day at Day 12.
Break-day attribution traces back to the specific iteration cluster that caused the break — "Supplier S2 at P85 lead time AND demand at P75 simultaneously, firing at Day 11." The planner sees the cliff before commit. The mitigation — shift the sourcing split from 70/30 to 60/40 — is a defensible decision rather than a hunch.
EVW (Expected Value of Waiting) is the related economic primitive. For every supply event near its release window, lookahead computes the expected value of waiting one more day before committing — what's the dollarized cost of premature commit versus the dollarized cost of delay? The EVW informs the auto-commit logic; high-EVW decisions surface for human review even when value at risk is below the autonomy threshold. Chapter 5.4 develops EVW in dollar terms.
You stop signing plans you have not stress-tested. Every commit is scored, every break day named, before the shock arrives.